Ship Repair/Hull

Minimum Order : 1 , Other

Contact Now

Product Details

GENERAL NOTICE 
1.The rates quoted herein are in US Dollars.
2.The rates are applicable to the works carried out the normal working hours, that is five working days a week, and eight working hours a day. Ant works done outside of this hours or on National holidays and yards holidays shall be charged with extra overtime, ship on voyage repair will be priced extra.
3.All prices quoted herein are for ship repairs carried out in the premises of shipyard, extra price should be added for such repairs carried at the port berth, buoys, anchorage according to the actual work to be done.
4.Any vessel during the period of repair in the yard, unless agreed by the yard, the Customer shall not be permitted to employ any labour other than yard to perform repairs.
5.The yard shall not be responsible for the consequences of war, earthquake or causes beyond yards control.
6.All scrapped material except heavy parts of machinery, propeller and tailshafts shall be yards property.
7.This tariff is applicable to repair of freight carriers only, repairs of other types of ship are beyond of this tariff scope.

8.This tariff becomes effective from January 1st 2007 subject to revised price depending on the change in material cost etc. without notice.


Hull Department


    1. Cleaning & Painting

1.1 Marks Repainting

G.R.T.

Draft marks

Ships name & port of registry

Plimsoll`s marks

Up to 5,000 5,001 – 7,500 7,501 – 10,000 10,001 – 15,000 15,001 – 20,000 20,001 – 25,000 25,001 – 30,000 30,001 – 35,000 35,001 – 40,000 40,001 – 50,000 50,001 – 60,000 over 60,000

120 130 140 160 170 180 190 200 220 260 320 extra

84 98 119 140 154 168 182 204 224 290 350 extra

60 70 85 100 110 120 130 140 160 190 240 extra

Note: (1)staging shall be extra. (2)Paints to be supplied by owner. (3)Above price will be only applicable to work carried out in dock.

1.2 Hull cleaning (per M2)

High pressure water washing (pressure over 200 kg/cm2) Washing down with fresh water Removal of oily spots

0,80 0,30 4,00

Note: (1)Under 300m2, prices shall be charged extra. (2)Staging shall be extra.

1.3 Painting (Per m2)

Description

Touch up one coat

Full the coat

Bottom and waterline Top side Deck Cargo Hold

0,40 0,40 0,35 0,45

0,35 0,35 0,30 0,40

Note: (1)Staging shall be extra. (2)Paint supply by owner. (3)If coating of bitumen paint are required. Extra shall be charged with addition of 20% if coating SPC thickness 75 micron add 50% charge. Over 75 micron shall be extra.

1.4 Scraping and Chipping (per m2)

Description

Scraping

Chipping

Bottom and waterline Top side Deck Cargo Hold

1,50 1,25 1,15 2,10

5,25 3,50 3,00 6,00

Note: (1)Prices for surface area in dirty condition be charged extra. (2)Staging shall be extra. (3)Other tank work shall be charged extra.

1.5 Gritblasting (per m2)

Description

SA2.5

SA2

Grit swecping

Bottom and waterline Top side Deck Cargo Hold

10 11 12 14

8 9 10 12

4 4 5 6.5

Note: (1)Spotblasting (hull up to 300 m2, hold up to 500 m2 per hold) shall be charged with extra 50 % of above price. (2)Excluding necessary staging and other accessory work. (3)Other tank above price extra charged. (4)Surface area in dirty condition to be charged extra. (5)Mechanical scaling before Gritblasting, price shall be extra.

1.6 Staging (actual length/per meter)

Outside shell In cargo hold In engine room

4 5 6

Note: (1)Under 30m, additional 50% of above to be charged. (2)Prices for in – side, difficult area such in internal tank, hold. etc, to be charged extra 100%. (3)At the superstructure, mast etc high position, to be charged extra. (4)Use hydraulic crane working 50 USD per hour per set.

    2. Anchor, anchor cables (port and starboard)

2.1 Ranging anchors and cables, port and atarboard sides, wash down chain cables with fresh water, light scraping, apply one coat with owner`s supplied paint and restore, unshacking, and reshaking, measure chain cable diameter marking and close up on completion.

G.R.T.

Above all work

Range down, wash and measure, completion

Up to 5,000 5,001 – 7,500 7,501 – 10,000 10,001 – 15,000 15,001 – 20,000 20,001 – 25,000 25,001 – 30,000 30,001 – 35,000 35,001 – 40,000 40,001 – 50,000 50,001 – 60,000 over 60,000

800 1000 1100 1200 1400 1500 1600 1700 1800 2000 2500 extra

480 600 660 720 840 900 960 1020 1080 1200 1350 extra

Note: (1)Range down and wash, measere and close up on completion excluding chain reversing, overhaul of chackles, marking, painting. (2)All paints and bitumen will be supplied by owner. (3)Unchacking and reschacking per piece 20, reversing per piece 120.

2.2 Chain locker (port and starboard) clean, apply one coat with owner`s supplied paint and bitumen.

G.R.T.

Above all work

Wash

Up to 5,000 5,001 – 7,500 7,501 – 10,000 10,001 – 15,000 15,001 – 20,000 20,001 – 25,000 25,001 – 30,000 30,001 – 35,000 35,001 – 40,000 40,001 – 50,000 50,001 – 60,000 over 60,000

420 480 540 600 660 720 780 840 900 1020 1140 extra

250 290 320 360 400 430 470 500 540 610 680 extra

Note: (1)All paint and bitumen will be supplied by owner. (2)Excluding chipping and other assistance work. (3)Remaining water and grating removal excluded. (4)Removal of mud 60/ton, over 10 tons, 50 ton. Remaining water 30/ton, over 10 tons, 25/ton.

    3. Steel Work

3.1 Renewal
Following costs shall be applied to renewal of welder construction plates such as side plates, main deck plate and bulkhead plate.

Weight of steel

Per ton price

Up to 1 ton Up to 5 ton Up to 10 ton Up to 100 ton Up to 200 ton Up to 300 ton Up to 400 ton Over 400 ton

Extra 2,803 2,689 2,565 2,395 2,265 2,135 2,010

Note: (1)The rates for weights are charged on the continued – scope. Steel weights of the separate position do not added up together. (2)Above price are applicable to steel plate of 10mm thickness and over 10mm; up to 10mm extra add 10%. (3)Less than 3mm will be charged extra. (4)Followings plates renewal to be extra: Engine room and pump room 10% Up D.B.Tank, F.P.Tank and A.P.Tank Deep tank and wing tank 20% Up Oil tank 30 % Up Bottom plate and hold bottom plate 20% Up Keel plate of forward or stern area 50% Up Bulbous bow 150% Up Fashion plate, stern plate 75% Up Hawse pipe 50% Up Corrugated bulkhead plate, hinged, folding hatchcover, “PAM” type singlepull hatchcover, price by arrangement. (5)Following quality plate renewal price to be extra: Plate with single curvature 12% Up Plate with double curvatures 25% Up High strength plate 20% Up Special steel extra Strainght frame 10% Up (6)Above price exclude tank work, oil shigting, tank cleaning gas freeing and removal of blocks, staging, shot blasting, water and jet cleaning other pressure testing, X-ray examination and other accessary work. (7)Steelweight to be calculated from greatest length and bresth plus 2% of steel weight on allowance for wastage. (8)For off fair and refit, price shall be at 80% of it`s renewal price. (9)For patching instead of cropping, price at 85% of it`s renewal price. (10)Steel weight up to 8kg, USD. 32 per pc. (11)For fair in place, price at 50% of it`s renewall price.

3.2 Handrails and fence (on deck)

Handrail renewal (pipe 1 1/4 – 1 1/2) (round bar 3/4) Renewal of stanchion Rectify in price

16/m 14/m 24/m 10/m


3.3 Cargo hatch cover and watertight door, manhole cover:

        a) Cargo hatch cover

Packing renewal (owner supply packing) Derusting for packing groove

8/m 7/m

Note: (1) Removal and refitting of hatch cover shall be extra (2) Hose test shall be extra.

                                 b) Watertight door

Packing renewal Water test

70/pc 8/pc


        c) Manhole cover

Opening and closing manhole cover Packing renewal (including cover opening and closing)

30/pc 60/pc

Note: (1) Renew bolts and nuts be extra.

    4. Tank Work

4.1 Tank cleaning

        a) Fresh water tank

Up to 100m3/tank Over 100m3/tank

2.05 m3 1,85 m3

Note: The above price will be based on tank capacity above 50m3, up to 50m3 tank capacity shall be extra.removal of scale and mud and ventilation shall be extra.

                                 b) Sea water tank

Up to 200m3/tank Over 200m3/tank

2,20m3 2,00m3

Note: The above price will be based on tank capacity above 100m3, up to 100m3 tank capacity shall be extra.removal of scale and mud and ventilation shall be extra.

                                 c) Oil tank

Up to 100m3/tank Diesel oil Fuel oil Over 100m3/tank Diesel oil Fuel oil

7,5m3 12,00m3 6,5m3 10,00m3

Note: (1)Above price will be based on tank capacity above 50m3, up to 50m3 tank capacity shall be extra. (1)Engine room double bottom tank, lub oil tank cleaning, price shall be charged as diesel oil tank. (2)Above price exclude opening and closing manhole cover, removing pipes and obstruction for access. (3)Steaming and solvent washing will be charged extra. (4)Provide ventilation fan equipment shall be extra. (5)Tank removal mud shall be extra. (6)If the tank clean for hotwork, price shall be extra.

4.2 Derusting and removal mud
        a) Painting and derust prices shall base on prices for cargo holds painting, to be charged at higher level, which are to be fixed according to the works contents.
Wash cement (supplied by owner)

Tank capacity

2,00 per m3 per coat


        b) Removal mud etc

Removal Oil sludge Mud Mud over 100 tons Sewage disposal Remains water Remains water over 10 tons

240 per ton 60 per ton 50 per ton 90 per ton 30 per ton 25 per ton


        c) Tank testing

Sea water test Fresh water test

1 per m3 2 per m3

Note: (1)For tank capacity up to 50m3, shall 50m3 charge. (2)Air test per USD 1 per m3 (3)The above price exclude manhole cover removing, staging, cleaning out remaineders of the tank and any repair work and pumping water out of tank after test.

    5. Derrick union

4.1 Tank cleaning

        a) Derrick goose neck
        To open, draw pin, clean, adjust and reassemble, per pc

SWL 5 tons 10 tons 15 tons

110 120 145

Note: access staging, renewal or repair, if any, to be extra.

                                 b) Block
        Single cargo block overhauling of topping, per pc

SWL 5 tons 10 tons 15 tons

80 100 125

Note: (1)Double sheaves block overhauling in place, the charge shall add 50%, three sheavers add 80%, four sheavers add 100%. (2)Access staging, renewal or repair, if any, to be extra. (3)Bull type bearing block 20% up to above price. (4)Deck crane post sheave and job sheave block overhaul per unit: 5 ton 260 10 ton 350 (5) If removal to workshop overhauling shall be above 25% add price. (6) Cable removal shall be extra.

                                 c) Derrick boom and deck crane load test by weight, per unit
        Derrick boom test proof weight

SWL 5 tons 10 tons 15 tons

145 195 245


        Heavy derrick load test by weight

SWL 30 tons 50 tons 80 tons

1155 2165 4300


        Deck crane test proof weight

SWL 5 tons 10 tons 15 tons

240 340 440



Send Inquiry